Entered baseline
Existing fixed-speed input power and annual hours are entered for each operating band rather than assumed from a control method.

Compare an entered fixed-speed operating profile with an indicative variable-speed case, then evaluate annual savings, payback and present value.
Registration required for results
Calculation basis
Existing fixed-speed input power and annual hours are entered for each operating band rather than assumed from a control method.
Dynamic head varies with flow squared, while the entered static-head share remains. VSD losses are applied separately.
First-year net savings, simple payback and discounted present value use the entered tariff, escalation, maintenance and project cost.