Metsiworx Engineering Tools

Practical calculations
for pumping systems

Select a calculation category. Each tool records the project inputs, provides an immediate preliminary result and creates a branded calculation report.

Verified registration is required

You may review the available calculation categories below. Opening a calculator requires automatic email verification and a one-time company profile. The online tools provide free preliminary calculations. Any Metsiworx design input, engineering review, equipment selection, signed output or formal deliverable is a separately scoped and paid professional service.

Choose an engineering tool

Tools are added progressively and remain subject to independent engineering verification.

ElectricalAvailable now

Pump Station Generator Sizing

Compare DOL, star-delta, soft-starter, standard VSD and low-harmonic VSD starting arrangements.

  • Running and starting demand
  • VSD harmonic allowances
  • PDF calculation report
Open calculator →
LifecycleAvailable now

Pump Lifecycle Costing

Compare pump alternatives using capital cost, energy consumption, maintenance, downtime and operating life.

  • 5 to 40-year evaluation
  • Escalation and present-value discounting
  • Payback and cost comparison
Open calculator →
HydraulicAvailable now

Pump Duty, TDH & Motor Sizing

Calculate the duty per operating pump, total dynamic head and preliminary motor requirement.

  • Static, pressure and friction head
  • Hydraulic and electrical power
  • PDF calculation report
Open calculator →
HydraulicAvailable now

Pipe Velocity & Friction Loss

Calculate flow velocity, Darcy friction, minor losses and pressure loss for a pipeline section.

  • Laminar and turbulent flow
  • Project-defined velocity limits
  • PDF calculation report
Open calculator →
EnergyAvailable now

VSD Pump Energy Savings

Compare an entered fixed-speed load profile with an indicative variable-speed operating case.

  • Three operating demand bands
  • Annual energy and cost savings
  • Payback and project NPV
Open calculator →
HydraulicAvailable now

Parallel Pump Operation

Fit entered pump and system curves to quantify the actual flow gained as identical pumps are added.

  • Two to six pumps in parallel
  • Operating flow and head
  • Incremental-flow comparison
Open calculator →
ElectricalAvailable now

Cable Sizing & Voltage Drop

Screen a candidate pump-motor cable for operating current, derated ampacity and running and starting voltage drop.

  • Required tabulated ampacity
  • Installation correction factors
  • Motor-starting voltage drop
Open calculator →
ElectricalAvailable now

Transformer & MCC Sizing

Convert project load groups into diversified transformer demand and preliminary MCC ratings.

  • Transformer demand and rating
  • Incomer and busbar capacity
  • Terminal fault-current screening
Open calculator →

A growing technical resource

01

Wet-well Sizing

Working volume, drawdown time and pump-start frequency.

02

NPSH Screening

Available suction head and preliminary cavitation-risk screening.

03

Pump Efficiency Assessment

Measured hydraulic and wire-to-water efficiency with improvement screening.

04

Surge-risk Screening

Preliminary transient-risk indicators for rising mains and pump trips.